Hook lift with a realistic roll-off container system

For example:

1 Fire Department → 2 WLF → 6 AB

When an AB is dispatched and a WLF then deploys, this AB is coupled to the respective WLF by the ILS after notification from the WLF.

When two ABs are dispatched, the same principle applies, but it takes longer for a 3rd required AB to arrive at the scene because one of the two WLFs has to drop off to pick up the next AB.

Additionally, the function to select “preferred WLF” in the administration would be desirable.

8 Likes